Wind Power Topographic Survey Work Experience
Lucky Wind and Solar Power
300 acres Lucky wind and Solar power project topographic survey for OES (Pvt.) Ltd. The project location was at Lucky cement plant at M-9, Nooriabad, project was of 1.5 Km length & 815 meter width, GIS mapping of surrounding 5 Km radius area detail including shape files of country wise location, province wise location, nearby Goths, TINs file, contour, DEM file, meta data, administrative boundaries, and major transportation with Google image.
Tricom Wind Power
342 acres Tricom wind power project topographic survey for OES (Pvt.) Ltd. The project location was at Jhampir district, Nooriabad, project was of 10 Km length & 150 meter width, GIS mapping of surrounding 5 Km radius area detail including shape files of country wise location, province wise location, nearby Goths, TINs file, contour, DEM file, meta data, administrative boundaries, and major transportation with Google image.
Zephyr Wind Power
2267 acres Zephyr wind power project topographic survey for OES (Pvt.) Ltd. The project location was at Jhampir district, Sindh coastal highway, project land included 1100 acres creek area, GIS mapping of surrounding 5 Km radius area detail including shape files of country wise location, province wise location, nearby Goths, TINs file, contour, DEM file, meta data, administrative boundaries, and major transportation with Google image. Contour interval was at 0.2 m.
HEI-DATANG Wind Power
28000 acres HEI-DATANG wind power project topographic survey for Alternate Energy (Pvt.) Ltd. The project location was at near Darawat dam, Jhampir district, project land included Goths, canal, cultivated land, and power lines. Contour interval was 0.2 m.
UEP Wind Power
3320 acres UEP wind power project topographic survey for First Wind (Pvt.) Litd. The project location at Nooriabad, Jhampir district, project land included hilly area, Nallah, and Goths. Contour interval was at 0.2 m.
Fina Energy
425 acres Fina wind power project topographic survey for ZEL (Pvt.) Ltd. The project location was at Nooriabad, Jhampir district, project land included hilly area, Nallah, and Goths. Contour interval was at 0.2 m.
Hawa Energy
1200 acres Hawa wind power project topographic survey for Alternate Energy (Pvt.) Ltd. The project location was at Nooriabad, Jhampir district, project land included hilly area, Nallah, and Goths. Contour interval was at 0.2 meter.

Ask a Question
11 Years Record
We do not compromise on accuracy, this is our hallmark.