Power Plants Survey Work Experience
Kamoke Power Plant
Execution survey for Technomen Kinetics (Pvt.) Ltd. of Kamoke power project at Gujranwala, in December 2009 to January 2011.
Responsibilities
Executed the plant design as per drawings and controlled the distance, angles and levels given on drawing.
Horizontal & Vertical Control of
- Boundary wall
- Equipment foundation
- Evaporation pond
- Buildings
- Engine foundation
- Pipe racks
- Earth work
Nooriabad Power Plant
Xpert Surveyors worked as a survey contactor in Technomen Kinetics (Pvt.) Ltd. of Nooriabad power project at Nooriabad, in July 2012 to till August 2015.
Responsibilities
Executed the plant design as per drawings and controlled the distance, angles and levels given on drawing.
Horizontal & Vertical Control of
- Boundary wall
- Equipment foundation
- Evaporation pond
- Buildings
- Engine foundation
- Pipe racks
- Earth work