Attock Cement Plant
Execution survey for ACL project of Attock cement line-2, From February 2005 to September, 2006 at Hub Choki, Baluchistan.
Responsibilities
Executed the plant design as per drawings and controlled the distance, angles and levels given on the drawing.
Horizontal & Vertical Control of
- Vertical Raw Mill
- Raw Material Grinding
- Raw Material Proposing
- Shell &Iron Storage
- Preheater
- Kiln Inlet Bag Filter
- Blanding Silo
- Centre Control Room
- Compressor
- Cone
- Kiln
- Clinker Cooler
- Cyclone
- Hot Gas Bag Filter
- Under Ground Water Tank
- A/C Tower
- Clinker Silo
- Pump House